Plus d’un million de livres à portée de main !
Bookbot

Multi-stage simultaneous lot-sizing and scheduling

Planning of Flow Lines with Shifting Bottlenecks

Paramètres

  • 208pages
  • 8 heures de lecture

En savoir plus sur le livre

Due to a varying product demand (changing product mix) and different production speeds, bottlenecks may shift between the stages. In that case, a simultaneous lot-sizing and scheduling of these stages is recommendable. Hence, an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) was developed. Moreover, several reformulation techniques were applied to this model to solve it exactly. Besides, a new meta-heuristic which combines the principles of Variable Neighborhood Decomposition Search (VNDS) and Exchange was implemented to find good solutions, even for a real-world problem case. Finally, further model extensions, e. g., for scarce setup resources, were proposed.

Achat du livre

Multi-stage simultaneous lot-sizing and scheduling, Florian Seeanner

Langue
Année de publication
2013
product-detail.submit-box.info.binding
(souple)
Nous vous informerons par e-mail dès que nous l’aurons retrouvé.

Modes de paiement

Personne n'a encore évalué .Évaluer